The mighty backhoe

The completed framing for the future patio doors

The ever essential coat closet.

PF on his coffee break. Coffee by Manu.


The Tall House is a veritable hive of activity today. Plumbers plumbing, Electricians de-wiring, PF and Louis erecting walls, not to mention a big honking backhoe tearing up the place.


The backhoe was brought in to dig up the front yard so that we could replace the old lead pipes that stem from the city ducts to our house. But as an added bonus the ugly-beyond-mention brick-a-brack flower container is no more. Money well spent.


Most of the framing has been completed. PF and Louis are magicians and take extreme pride in their work. Because of them we will have beautiful, straight walls (quite a feat seeing as the Tall House is anything but square) not to mention a lovely straight ceiling. For a while we had considered trying to do the framing ourselves but once we were confronted with the geometrical headache that the crooked, stripped walls represented we knew that we were out of our depth. So PF and Louis have been working their magic since Monday, easily accomplishing in 5 days what would surely have taken us a very painful 3 weeks.


Manu also spent two half days (and a few nights) working alongside them doing the grunt work: insulating some walls, lining others with black paper, cleaning up, even getting coffee. And although the work is hard, I can tell that Manu is having the time of his life, taking great pride in his unofficial apprenticeship with two masters of their trade.